Data Centers

Milan, Italy

MIL1

SEND MEDIA REQUESTS TO

cyrusone-data-center-milan-italy

Introduction

CyrusOne MIL1 is a brand-new state-of-the-art data center strategically located on a 74,866 sq. m. (18.5 acre) site in the Municipality of Segrate, East Milan, at the gateway between Italy, Europe and the Mediterranean basin. The site is planned for 63 MW of total IT capacity. The initial building includes three 9 MW data halls across three floors, with the first phase currently expected to be operational by Q3 2027. 

Key Features:

sq-ft

9,000 sq. m.

Technical IT Space

megawatts

63 MW

Total IT Capacity

Technical Specifications

  • Three 9 MW data halls over three floors
  • Free-cooling technology with ASHRAE Standards optimization
  • Advanced monitoring systems
  • Real-time infrastructure oversight
  • Multi-layered security with 24x7x365 staffing
  • Advanced access control systems
  • Comprehensive video surveillance

Sustainability

  • BREEAM "Very Good" target certification
  • ISO 14001 Environmental Management target certification
  • ISO 50001 Energy Management target certification
  • 100% powered by renewable energy
  • Low PUE and WUE through closed-loop water cooling systems
  • Zero Waste to Landfill program
  • Sustainable building materials
  • Local contractor and staff sourcing where possible
  • Expanded pedestrian walkways and cycling paths
  • Photovoltaic panels installation program
  • Heat recovery system for internal use
  • 658,628 sq. m. Golfo Agricolo land for community use
  • Link road and Via delle Regioni infrastructure development
  • Over 130 trees of 12 different species
Contact Us

Connect with Our Team for Expert Guidance

Our specialized team is ready to help you navigate the complexities of digital infrastructure. Whether you're expanding globally, optimizing your data center strategy, or looking for sustainable solutions, we'll guide you through every step of your journey.